Why choose building with steel frame?
1. Short construction period: Compared with the traditional concrete structure, the construction period for building with steel frame is about 1/3 shorter than the traditional concrete structure |
2. Improve investment efficiency: Short construction period can reduce the pressure of capital occupation, reduce the risk of market change, and improve the investment efficiency of the building. |
3. Reduce foundation cost: The requirement of steel building on foundation load is reduced, which can greatly reduce foundation cost and civil foundation cost. |
Building with steel frame structure show:
Main component for building with steel frame:
Column: | galvanized or painted Q235, Q345 H section steel or square tube |
Beam: | galvanized or painted Q235, Q345 H section steel or square tube |
Purlin: | Galvanized Q235 C channel |
Vertical and transversal support: | Q235 angle steel, round bar or steel pipe. |
Tie bar: | Q235 steel pipe |
Brace: | Q235 round bar |
Sleeve: | Q235 steel pipe |
Roof: | corrugated steel sheet with insulation or EPS, rock cotton, glass fiber or PU sandwich panel |
Wall: | EPS, Rock cotton, Glass fiber or PU sandwich panel |
After you provide us with the following information, you can get a quotation soon:
1. Size: Length*Width*Height ( eave height )*ridge height?
2. Local Wind Speed(km/h), Snow load(kg/m2)
3. Wall and Roof: Steel Sheet or EPS, Rock cotton, Glass fiber or PU sandwich panel
4. Door and windows: size and quantity
5. Other needs or not: gutter, downpipe, skylight panels, fan
6. As your drawings or requirements.
7. Steel structure drawing: we have a professional technical team that can provide you designing structure drawings, production drawings, installation instructions etc..
Qingdao Showhoo Steel Structure Co.ltd is a professional supplier with large scale, specializing in steel structure designing, production and installation. Our company has various kinds of products including steel structure workshop, steel structure warehouse building, steel structure building, steel structure poultry shed, garage, shed, chicken farm etc.
We have 5 production line of H section steel with 20,000 T annual production, 2 production lines of C&Z section steel with 16,000T annual production, yearly production exceeds 2 milllion meters corrugated steel sheet and sandwich panel with 5 production lines.
We have professional design team for Tekla, 3D3S, PKPM, CAD, also we could supply the steel structure building as per our client's design.
Packing&Transport for steel structure:
According to container size, inside capacity for container of 20 feet is 5.69m x 2.34m x 2.18m, gross weight of allocation is generally 17.5 ton, volumn is 24-26m3.
Inside capacity for container of 40 feet is 11.8m x 2.34m x 2.18m, gross weight of allocation is generally 22 ton, volumn is 54m3.
There are 4 options of installation as following:
1. Clients install it by themselves according our drawings and simple video.
2. Our engineer help our client to install on construction site.
3. We provide installation team to help.
4. Our client arrange their engineer to visit our factory and learn how to install from our engineer.
1. Common type of the Building with Steel Frame?
Reply: Portal frame is the usual type in the industrial workshop and warehouse shed. Other types also could be designed and manufactured as per clients’ request.
2. What’s the quality grade of the steel structure components?
Reply: Q345 is used for main steel structure, Q235 is used for secondary steel structure.
3. How about the delivery time?
Reply: Usually,within 25-30 days after the order confirmed, also depends on the fabrication quantity.
4. How about the derust grade?
Reply: Ball blasting Sa2.5 on main steel structure;
manual derust St2.0 on secondary steel structure.
5. Which kind of panel are used for the roof and wall?
Reply: Color corrugated steel sheet and sandwich panel could be used. Sandwich panel performs well on the heat insulation,sound insulation.Common sandwich materials are EPS, glass wool and PU.
6. Maintenance:
Reply: Finish paint need be done after the frame installed, and do it again after 6-8 months. So the surface will stay more time.
Our main related steel structure project:
Any query for Prefabricated steel structure building / house with light steel frame and sandwich panel, please kindly click the following " send " button.
Welcome to ask us any questions and we would like to supply the best service for you !
Contact Person : | Aaron |
---|