Prefabricated light steel structure warehouse is widely used as storage for industrial use. All steel components are pre-fabricated and finished in our factory. No need re-work on the job site. With fast installation light weight, and low cost, prefabricated steel structural warehouse can be your best choice.
1.According to your order ,customize the design drawing free of charge.
2. Give our professional advice according to the job site conditions.
3.Settle transportation affair.
1.Supply with all the detailed drawings for installtion and fabrication.
2.Send one engineer to the job site to help you if needed.
3.Provide related production as per your need.
1.Reasonable advice for usage, maintenance, technical improvement.
2.Unique engineer to be in charge of your project.
3.On-site service.
Welded or hot rolled H section column and beam are used to build up the steel frame. Less weight but much more strong for prefabricated steel warehouse.
All small components are welded together in our facoty, no further re-work on the job site. Easy to install and disassemble, which makes the building cycle of structural steel frame warehouse construction very short.
Anchor bolts are used to connect steel column with the foundation.
Sriffeners are used to enhance the links bwtween columns and foundation in metal prefabricated steel buildings low cost.
Models of the anchor bolts are customized based on different projects.
C or Z section channels (surface treatment is galvanized, no easy to rust) are used to build up the roof steel frame. Cable bracing are used to enhance the links bewteen two steel frame for low cost prefabricated steel structural warehouse.
Steel rod and steel pipe's (surface treatment is galvanized) function is to enhance each purlins. Steel angle is used between purlin and beam.
Both sidewall and endwall use C ection channels (surface treatment is galvanized) for the cladding system.
Connection type is plain bolts, usually model M12 is widely used.
Frame for door and window used steel tube or DOUBLE C channels. Steel rod, steel pipe and angle steel will also be used to strengthen wall framing elevation.
Single corrugated sheet is used to make the cost lower if the thermal insulation is not required.
In this way, it can meet the need of thermal insulation and also have reasonable cost.
Sandwich panel is the easiest way to meet the need oof thermal insulation but cost is the highest of these solutions. There are 3 kinds: EPS, ROCKWOOL and PU.
Beam or column in variable cross-section can also be produced.
After painting ,we will take measures to protect the painting , especially the edge of steel components.
Painting make-up work will be done on the job site beacuse of the damage caused by the long distance shipment, but not too much damage.
For the quotation, please kindly give us the details below. It will help us to give you the specialized disign free of charge.
Packing:
according to the container size and customer's requirement
20'GP 2.34x2.18x5.7m, 17.5tons
40' GP 2.34x2.18x11.8m, 22tons
40'HQ 2.34x2.71x13.58m,29tons
Delivery time:
20-35 days after receiving the deposit.
25000sqm factory area, 250+ workers make sure product has great efficiency and high quality.
With professional technical team, and perfect management system, we offer you best design and service.
Complete machines from H steel beams, c/z channels, gutter, corrugated single sheet to sandwich panel.
91.8% Response Rate
91.8% Response Rate
91.8% Response Rate
Contact Person : | Aaron |
---|